Will the first tunnel element for the Fehmarn Belt fixed link be immersed in 2024?
Mini
3
Ṁ52
Dec 31
58%
chance

According to the website:

6. Production and assembly of tunnel elements

The tunnel elements will be produced at the factory in Rødbyhavn and towed out to the Fehmarnbelt on an ongoing basis. The contractors will immerse the elements one by one and assemble them from the coast and out towards the middle of the belt from the Danish and German sides.

The first element will be immersed in 2024.

Get
Ṁ1,000
and
S1.00